Service Interruptions

Here you will find a current list of ongoing and upcoming service interruptions across the campus.

Service Interruptions & Outages

Date

Location and

Work Area

Impact for Building Residents

Project Manager

11/23-11/24

224 and 226 E. Cache La Poudre Street

Facilities Services will be performing a sewer main repair serving 224 and 226 E. Cache La Poudre Street on Monday, November 23. The repair is necessary to address a failed section of sewer piping.

Water and Sewer Service Interruption

  • Date: Monday, November 23
  • Time: 8:00 AM – approximately 5:30 PM
  • Affected Buildings: 224 and 226 E. Cache La Poudre Street

During this time, domestic water and sanitary sewer services will be unavailable. Occupants must not use toilets, sinks, floor drains, showers, or any other plumbing fixtures until service has been restored. Water and sewer service is expected to resume by approximately 5:30 PM.

Parking Lot Impacts

Repair work will take place in the northeast corner of the Childcare Center parking lot. Temporary parking restrictions will be limited to the immediate work area and are expected to affect only one or two parking spaces. The remainder of the lot will remain open and available for normal use. The parking lot is expected to return to normal use no later than November 24.

Following the sewer repair, asphalt and concrete restoration may continue for an additional five to seven business days. This work is expected to have minimal impact on parking, with any restrictions confined to the immediate repair area.

We apologize for the inconvenience and appreciate your patience while this necessary repair is completed.

 

Marcus Moreno

Ext 6915

 

 

 

 

Posted 11/19

  

Date

Location and

Work Area

Impact for Building Residents

Project Manager

11/23-11/24

Worner Student Center

Please be advised that chair replacement work will take place in Rastall's and Benji's in the Worner Student Center on November 23 and 24.

All chairs in both areas will be replaced during this time. Please use caution around the work areas and follow any posted access restrictions.

Thank you for your patience and cooperation as these improvements are completed.

 

Rick Greene

Ext 6052

 

 

 

 

Posted 11/19

 

Date

Location and

Work Area

Impact for Building Residents

Project Manager

11/23-11/27

Barnes/Olin

Please be advised that utility potholing work will be taking place in the Barnes/Olin area.

Contractors performing the work will include Bradley Excavating, LWA Surveying, and All Phase Locating.

Members of the campus community may notice utility vehicles and equipment in the area.

Please use caution when traveling near the work area and stay clear of active work zones.

Thank you for your patience and cooperation.

 

Rick Greene

Ext 6052

 

 

 

 

Posted 11/19

 

Date

Location and

Work Area

Impact for Building Residents

Project Manager

Ongoing

Armstrong Hall

1st floor

The HVAC system remains offline in the Registrar and Student Life areas on the first floor of Armstrong Hall.

The affected rooms include:

  • 100
  • 100A
  • 100C
  • 107
  • 108
  • 109
  • 110
  • 112

Replacement materials have been ordered and are expected to arrive in approximately two weeks. In the meantime, electric heaters have been placed in the affected areas to provide supplemental heat.

Facilities will continue working to resolve the issue and restore service as quickly as possible. Additional updates will be shared as more information becomes available.

We apologize for the inconvenience and appreciate your patience.

 

Mike Brubaker

Ext 7115

 

 

 

 

Updated 11/19

 

Date

Location and

Work Area

Impact for Building Residents

Project Manager

Ongoing

Armstrong Hall

Please be advised that domestic hot water is currently unavailable in Armstrong Hall.

Parts have been ordered to correct the issue, and we are currently awaiting a lead time for their delivery. We will provide an update once a repair schedule is available.

This outage affects domestic hot water only and does not impact heating in the building.

We apologize for the inconvenience and appreciate your patience while repairs are completed.

 

Mike Brubaker

Ext 7115

 

 

 

 

Posted 10/29

 

Date

Location and

Work Area

Impact for Building Residents

Project Manager

Ongoing

McGregor Hall

Please be advised that BMS CAT is onsite in McGregor Hall working on the second- and third-floor bathrooms and the basement mechanical room.

Drying equipment is currently in place in the affected areas. Once the areas have dried, demolition work will follow.

Please use caution around the work areas and do not disturb the drying equipment, as it is essential to the drying process.

Thank you for your patience and cooperation while this work is underway.

 

Luke Scott

Ext 6678

 

 

 

 

Posted 10/5

 

Date

Location and Work Area

Impact for

Building Residents

Project Manager

 

10/13-12/15

 

Cascade Ave by Armstrong

**PHASE ONE**

Please be advised that heating system repairs will begin Tuesday, October 13, to replace the underground central heating system piping between Armstrong Hall and Worner Campus Center.

The work will include fencing, excavation, and concrete removal in the areas highlighted in red on the map below.

 

Building occupants and pedestrians should expect noise from heavy equipment, concrete trucks, and other general construction activity during this work.

The sidewalk on the northwest corner of Armstrong Hall to Cascade Avenue will be closed during this phase of the project. Please use caution and follow posted signage around the work areas.

Work is expected to continue through December 15, weather dependent. Additional updates will be provided as the project progresses, including information regarding any building shutdowns or temporary sidewalk and road closures.

Thank you for your patience and cooperation while this work is underway.

 

Mike Brubaker

Ext 7115

 

 

 

 

Updated 10/9

 

Date

Location and

Work Area

Impact for Building Residents

Project Manager

11/17-12/31

Lennox House

Basement

Please be advised that Facilities Services will be conducting investigative work in the basement of Lennox House to identify the source of a leak.

The basement will be off-limits to all occupants and visitors for the remainder of the year. Please do not enter the basement until further notice.

We apologize for the inconvenience and appreciate your cooperation as we work to identify and address the issue.

 

Jamal Westry

Ext 7969

 

 

 

 

Posted 11/17

  

 

  

 