Service Interruptions
Here you will find a current list of ongoing and upcoming service interruptions across the campus.
Service Interruptions & Outages
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
5/27
|
Robson
Yalich Student Center |
Please be advised that Facilities will be conducting smoke testing of the plumbing sewer system at the Robson-Yalich Student Center on May 27 from 1:00 PM – 4:30 PM. Areas that may be impacted include the Mail Room, Student Health and Wellness Center, and Bookstore. The smoke used during testing is non-toxic; however, individuals with respiratory sensitivities or health concerns may wish to avoid the area during the testing period. You may notice smoke or odor in and around the affected spaces during this time. This testing is necessary to help identify potential issues within the sewer system. Thank you for your patience and understanding.
|
Ext 6915 |
|
|
|
|
Posted 5/26 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
5/18-5/29 |
Campus wide |
Please be advised that work to upgrade the campus fire alarm panels will begin on May 18. This campus-wide project will integrate the existing fire alarm system into the new system. During the upgrade process, both the old and new systems will be operating and monitored simultaneously to ensure continued fire alarm coverage and safety. The project is expected to take approximately 10 working days to complete. Contractors and Facilities personnel may be present in buildings throughout campus during this time. We appreciate your patience and understanding as these important upgrades are completed.
|
Ext 7632 |
|
|
|
|
Posted 5/12 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
5/20 - 6/20 |
Campus wide |
The Environmental Health & Safety Department, along with JCI, will be conducting annual fire extinguisher inspections in all campus buildings from May 20 through June 20. Please expect staff and contractors to be working throughout campus during this time. Thank you for your cooperation and support as we complete this important safety inspection process.
|
Ext 6678 |
|
|
|
|
Posted 5/14 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
5/22-5/29 |
Ticknor Hall
Montgomery Hall |
Please be advised that repairs are currently being made to the heating systems at Ticknor Hall and Montgomery Hall. During this time, there will be no heat throughout both buildings from May 22–29. We appreciate your understanding and patience while this work is completed.
|
Ext 7111 |
|
|
|
|
Posted 5/26 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
5/26
5/27
5/28
5/29 |
Hybl/East Residences
JLK Blanca
Antero Edith Gaylord
McGregor Shove Chapel Montgomery Arthur |
Please be advised that Johnson Controls (JCI) will be onsite checking sprinkler heads and fire related equipment.
During this time, there will be brief activations of strobe lights and audible alarms as well as brief water outages as part of the testing process. These interruptions will be short and are part of routine system checks.
Thank you for your understanding and cooperation.
|
Ext 6678 |
|
|
|
|
Posted 5/21 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
6/2
6/3
6/4
6/5 |
South Hall
Ticknor El Diente Lennox
Mathias Hall
Bemis Hall |
Please be advised that Johnson Controls (JCI) will be onsite checking sprinkler heads and fire related equipment. During this time, there will be brief activations of strobe lights and audible alarms as well as brief water outages as part of the testing process. These interruptions will be short and are part of routine system checks. Thank you for your understanding and cooperation.
|
Ext 6678 |
|
|
|
|
Posted 5/26 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
5/18 - August |
FAC |
Please be advised that Monument Roofing is currently performing a roofing project at the Fine Arts Center (FAC). This work is necessary to maintain the integrity of the building and help ensure a safe and comfortable environment for everyone. The project is anticipated to continue through early August. We will continue to share updates throughout the duration of the project as information becomes available. What to Expect: Safety Reminders: We appreciate your patience and cooperation as we complete this important project. Our goal is to minimize disruptions while ensuring the work is completed safely and efficiently.
|
Ext 6052 |
|
|
|
|
Updated 5/26 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
Ongoing |
Cascade Ave |
Please be advised that the City of Colorado Springs is currently performing tree trimming and tree removal work at various locations along Cascade Avenue. There is no set schedule for this work at this time. Please be aware that sidewalks may be temporarily blocked and city workers and equipment will be present in the area. We appreciate your patience and understanding.
|
Ext 7115 |
|
|
|
|
Posted 5/26 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
Ongoing |
JLK |
Please be advised that due to a leak originating on the 3rd floor of JLK, the 2nd floor area outside of McHugh Commons has been affected. Ameri Dri currently has drying equipment in place to assist with water mitigation efforts. Jimenez Drywall is expected to begin reconstruction work shortly. Please expect workers and equipment in the area during this process. Thank you for your patience and understanding.
|
Ext 6678 |
|
|
|
|
Posted 5/21 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
Ongoing |
West Campus Parking Lots |
Please be advised that asphalt repairs and maintenance are taking place in the west campus parking lots, and will continue until complete, weather permitting.
Here is a map of impacted areas and alternate parking locations. We appreciate your patience and cooperation during this work. If you have questions or need accommodations, please contact Kenny Rankin. |
Ext 6570 |
|
|
|
|
Posted 5/18 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
Ongoing |
JLK |
Please be advised that the air conditioning in the kitchen area and upstairs conference room at JLK is currently not functioning. Replacement parts have been ordered; however, due to a parts backlog, the air conditioning will remain out of service until further notice. We appreciate your patience and understanding as we work to restore service as quickly as possible.
|
Ext 7111 |
|
|
|
|
Posted 5/18 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
Ongoing |
Hybl Community Center |
Please be advised that the elevator in Hybl Community Center is currently out of service. We appreciate your patience and understanding as we ensure the safety and reliability of the elevator. If you have any concerns or require assistance during this time, please reach out.
|
Ext 6983 |
|
|
|
|
Posted 5/14 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
Ongoing |
East Campus Resident Buildings |
We would like to inform you that a lightning strike on April 27 impacted portions of the East Campus heating and cooling system, as well as the fire alarm system. Please note that the fire suppression system was not affected and continues to function as expected. Our teams are actively working to assess the damage and restore the affected systems as quickly as possible. We appreciate your patience and understanding as we work to resolve these issues. Additional updates will be shared as more information becomes available. If you have any concerns or questions, please don’t hesitate to reach out.
|
Ext 6678 |
|
|
|
|
Updated 5/12 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
Ongoing |
Armstrong Hall |
The heating system in Armstrong Hall is still out of service due to emergency repairs to the building’s hot water system. Repairs are ongoing, and full heating service has not yet been restored. With colder weather expected on Wednesday, May 6, temporary measures are being implemented to help maintain a comfortable indoor environment. Facilities staff will continue to monitor conditions in Armstrong throughout the day. Please contact Facilities with any questions or concerns. Thank you for your patience and understanding. |
Ext 7115 |
|
|
|
|
Updated 5/5 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
Ongoing |
Packard Hall |
Please be advised that several spaces in Packard Hall were impacted by a flood. The following rooms are currently off limits except for authorized personnel: The basement area and room 203 are functional and accessible. Access can be coordinated as needed through EHS (Luke Scott). AmeriDri, ARS, and CRDN are onsite to perform remediation work. At this time, there is no estimated completion date. Thank you for your understanding.
|
Ext 6678 |
|
|
|
|
Updated 1/29 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
Ongoing |
El Diente |
EHS responded to a reported flood in Unit #103 and identified a severe sewage backup originating from the kitchen sink. The incident impacted the entire first floor of the unit. Immediate mitigation actions are underway and include:
Due to the nature of this Category 3 (black water) intrusion, all drywall on the first floor is being removed to a 4-foot level, along with affected basement ceiling materials. All first-floor contents, including cabinetry, furniture, carpet, and major appliances, are considered a total loss and will be disposed of. Access to the second floor is currently restricted to prevent cross-contamination. Unit #103 will remain offline indefinitely. There is no estimated timeline for return to service at this time. Further updates will be provided as remediation progresses. Thank you for your cooperation in limiting access to the space.
|
X6678
|
|
|
|
|